T-1B3-TE-4 - Shift from freight air transport to electric rail freight
Background¶
IPCC WG3 definition: .
TBD
Transition Element¶
- Type of shift:
Type Shift
- Activity: TBD
- Operation: TBD
- ATOC: TBD
Activities¶
Shift from:
Shift to:
Parameters¶
Parameter | Unit | Description |
---|---|---|
YAML Specification¶
type: shift
longName: Shift from air freight transport to electric rail freight transport.
shortName: Freight air to electric rail
version: 2.0.0
description: Shift tonne kilometer from freight transportation by air to electric
rail in tonne kilometer to fulfill the need of logistics
unitOfMeasure: tonne_km
cohort:
expression: '1'
shiftFrom:
atoc:
expression: '1'
chains:
- chain: freight_transportation_by_air
shiftTo:
atoc:
expression: '1'
chains:
- chain: electric_rail_freight
cobenefits:
- air_quality
- reduced_noise